Following the acceptance of our Velocity I building, Childress Klein developed a second modern, flexible industrial building (Velocity II) that is centrally located near the Greer Inland Port and the BMW manufacturing plant.
Property features include:
- Located in Greer, SC, between the rapidly expanding cities of Greenville and Spartanburg
- Less than a mile and a half from the I-85 interchange
- 2.7 miles from the rapidly growing Greer Inland Port
- 1.25 miles to BMW manufacturing
- 52’-wide x 50’ deep column spacing with 190’-deep truck courts
- 32’ clear height
- (76) 9’x10’ dock doors
- 60’-deep loading bays
- Extensive on-site auto and trailer parking
- Served by the City of Greer Fire Department that carries an ISO Class I fire rating
This property was sold in 2023.
Location
Greer, SC
Size
+/- 297,607 SF
Year Built
2021
Partner
Cullum Interest, Inc.
Property Type
Services